Location: Burleigh, QLD 4220
Project Information:
In this recent project in Burleigh, we provided a mezzanine design, supply and installation of a 30 m² office area with a load capacity of 5 kPa. This Mezzanine was designed to met the necessary requirements of AS1428 standards as the client is using the space created to build an office.
As this is being used for an office, the right hand side, hand rail will be installed post build. Within this design, the client requested Black powder coating and the silver beam will be clad.
Solution
- 5kPa Loading Mezzanine Flooring
- Scissor & Forklift Provided
- Plywood Flooring
- Stairs to AS1428
- 30 Square Metres
- Install Completed in one day
- 3 week turn around
- All materials provided