Location: Burrum Heads, QLD 4659
Project Information:
We love working in and around Hervey Bay and this mezzanine floor design and install was for a client who wanted a solution for his home shed or “man cave”. The end project once we finished the mezzanine was for the builder to enclose the area, and create a home cinema.
We designed a solution with bigger span and bigger joists as the client wanted more clear and usable room underneath the mezzanine, with less columns to have to work around. This cracker project was finished off in 4 days by Rick Arnold Carpentry.
Solution
- 3kPa Loading Mezzanine Floor
- 80 Square Metres
- PFC Staircase
- C300 Joists @ 400 centres spanning 6 metres
- 4 x day install
- All materials supplied