Location: Southport, QLD 4215
Project Information:
This client in Southport sent through an email enquiry, wondering if it was possible to extend off of an original mezzanine, built by another company, in their warehouse in order to build an office. We were able design a solution that matched the height of their already existing mezzanine, that ensured the office build, happening post Mezzanine construction, would be a level and seamless finish.
Within the scope of this project we also provided, at client request, Engineering certification for both new and the existing structure.
Two weeks from initial design to completion, with the install taking one day.
Solution
- 3kPa Loading Mezzanine Floor
- 40 Square Metres
- Install Completed in one day
- 2 week turn around
- All materials provided