Mezzanine Floor Project:

32 Square Metres | 3kPa Client Self Install In Ormeau

Location: Ormeau, Gold Coast QLD 4208

Project Information:

We often get inquiries for a supply only solution, which involves providing the engineered design, and all materials necessary to build the mezzanine required.

This mezzanine floor in Ormeau was a supply only solution for a client, who engaged their builder to install the mezzanine, prior to building a lunch room and storage area on top.

Solution

  • 3kPa Loading Mezzanine Floor
  • 450 centre joists
  • 22mm Red Tongue Flooring Sheets
  • 32 Square Metres
  • 1 x day install
  • All materials supplied

Our Service Area

Apex Mezzanines offers supply and installation throughout all areas of Southeast QLD and Northern NSW. 

Request a Quote