Location: Yarrabilba, QLD, 4207
Project Information
Our latest mezzanine installation showcases exactly what we stand for: engineering precision, aesthetic quality, and seamless delivery.
The Project at a Glance
Mezzanine Size: 41 sqm
Clearance Height: 3 metres
Load Capacity: 3 kPa
Flooring: 21mm structural plywood sheets
Installation Time: 1.5 days
Lead Time: 3 weeks from order to completion
This project was all about creating a durable, non-habitable mezzanine structure that could support significant storage requirements while maintaining an open and professional look.
Every Apex Mezzanine is built on solid engineering principles. This installation came with a Form 15 Engineering Certificate, verifying the structure’s compliance and safety. The mezzanine’s 3 kPa load rating ensures robust performance.
To complete the look, we installed a custom designed and fabricated balustrade along the front edge, paired with a custom powder-coated black handrail designed specifically to the client’s needs.
The staircase was designed to the NCC Non-Habitable Standard, featuring 1000mm aluminium treads and open rails.
At Apex, we understand downtime is the enemy of productivity. That’s why this entire mezzanine was installed in just 1.5 days — thanks to our streamlined process and professional team.
With two scissor lifts and a forklift provided, as well as a skip bin on-site for waste management, our crew ensured the job was completed safely, efficiently, and without disrupting the client’s operations.
From concept to completion, Apex Mezzanines delivers turnkey solutions with precision. Every project is tailored, we ensure your mezzanine complements both your space and your workflow.