Location: Darra, QLD , 4076
Project Information
We recently completed a custom supply-and-install mezzanine floor project in Darra, fully installed in just two days using two scissor lifts and a forklift. Built to strict commercial standards and delivered on a fast turnaround, this structural addition instantly maximized the client’s available vertical space.
Compliance & Certification: Built to comply with AS1657 standards for stairs and handrails, complete with Form 15 engineering certification.
Rapid Installation: Fully installed in 2 days using 2 scissor lifts and 1 forklift.
Lead Time: Delivered in approximately 4 weeks from order placement.
Load Rating: Engineered for 5kPa Live Load & 4.5kN Concentrated Load.
Decking: High-durability 21mm Plywood flooring sheets.
Access & Safety: Staircase with 1000mm checkerplate treads, heavy-duty handrails, and a sliding pallet gate.