Location: , QLD, 4214
Project Information:
Our recent Mezzanine Floor in Molendinar involved a bit of carpentry work from our installation team. As part of our scope of works we created access to the Mezzanine floor via the existing office by removing a window and installing a glass sliding door out to the new Mezzanine.
This 55 Square Metre floor also had the addition of handrails & a forklift gate and was designed to allow for easy access to load the pallets. This project had a 3 week turn around from final design to installation, with the whole install including the building works taking 2 days.
The scissor lift was provided by the client as they already had one on site and we cleared all rubbish and materials from the building works.