Mezzanine Floor Project:

44 SQUARE METRES | 5kPa | DESIGN, SUPPLY & INSTALL | DARRA

Location: Darra, QLD , 4076

Project Information

We recently completed a custom supply-and-install mezzanine floor project in Darra, fully installed in just two days using two scissor lifts and a forklift. Built to strict commercial standards and delivered on a fast turnaround, this structural addition instantly maximized the client’s available vertical space.

Compliance & Certification: Built to comply with AS1657 standards for stairs and handrails, complete with Form 15 engineering certification.

Rapid Installation: Fully installed in 2 days using 2 scissor lifts and 1 forklift.

Lead Time: Delivered in approximately 4 weeks from order placement.

Load Rating: Engineered for 5kPa Live Load & 4.5kN Concentrated Load.

Decking: High-durability 21mm Plywood flooring sheets.

Access & Safety: Staircase with 1000mm checkerplate treads, heavy-duty handrails, and a sliding pallet gate.

Our Service Area

Apex Mezzanines offers supply and installation throughout all areas of Southeast QLD and Northern NSW. 

Request a Quote

Google
Google
5.0
Top Rated
Service 2026
verified by Trustindex
Trustindex verifies that the company has a review score above 4.5, based on reviews collected on Google over the past 12 months, qualifying it to receive the Top Rated Certificate.