Location: Currumbin, QLD , 4223
Project Information
This week, the Apex Mezzanines team completed a fast-turnaround access upgrade for a warehouse facility in Currumbin. The brief required integrating compliant access while preserving clear ground-floor circulation along an existing walkway directly below.
The Scope of Work
- AS 1657 Compliant Staircase: Custom-designed and fabricated risers, goings, and clearances engineered specifically to suit the walkway footprint below, finished in industrial black.
- Fall Prevention System: Supplied and installed 4 x fill-in sections featuring a complete top rail, mid rail, and kickplate (toe board) system in a durable galvanised finish to close off open ends of the existing structure.
- Structural Modifications: Decommissioned and removed redundant structural sections to allow clean, seamless tie-in of the new stair stringers and safety barriers.
Safety & AS 1657 Compliance A critical focus of this retrofit was bringing the platform edges and staircase into strict alignment with AS 1657:2018 (Fixed platforms, walkways, stairways and ladders).
To satisfy statutory edge-protection requirements, the infill assemblies incorporate a full three-tier barrier system:
- Top Rail: Positioned at the mandatory height to serve as a secure handhold and primary fall barrier.
- Mid Rail: Centred between the deck and top rail to eliminate hazardous openings and prevent personnel from falling through.
- Kickrail (Toe Board): Installed flush with the deck edge to prevent loose tooling, inventory, or debris from being inadvertently kicked off the elevated level onto the active pedestrian walkway below.
Efficient Turnaround Manufactured within a 3-week lead time, the on-site structural adjustments and installation were wrapped up in just half a day. By coordinating with the site team to utilize their walkie stacker for mechanical lifts, the install was completed with minimal footprint and zero disruption to daily warehouse operations.